1. Short thermal response time and less dynamic error;
2. flexible installation and usage ;
3. Large measurement range;
4.High mechanical strength and good pressure resistance.
Project |
Parameter |
|
Standard Range
|
Testing range(°C):-50~0;-50~50;0~50;0~80;0~100;0~120;0~150;0~200; |
|
Installation Mode: Inserting |
||
Depth of Inserting (mm): 50mm (typically, beyond the screw threads); custom-made available. |
||
Probe Size: Φ3,Φ4,Φ5,Φ6,Φ8 |
||
Technical Index
|
Sensor |
Pt100 Pt1000 |
Resistance |
1×Pt100 1tPT1000 |
|
Signal line specification |
2wire or 3wire 2wire or 3wire |
|
Accuracy |
Class A Class B Class 1/3B |
|
Pressure Resistance |
Typically 40bar (Max300bar) |
|
Longterm Stability (1 Year) |
±0.1%FS |
|
Response Time |
T=50°C 2.3s;T=90°C 5.4s |
|
Ambient Temperature |
-40~+85°C |
|
Storage Temperature |
-40~+125°C |
|
Housing |
316L stainless steel |
|
Wetted Parts |
316L stainless steel |
|
Environmental Protection |
IP65 |
1.Shutter support Specification
2. Single-ouch or Double-ouch
3. Lead Wire Material and Length
4. Protection Material and Length
5. Stainless steel armor tube Material and lLength
6. Spring material, ID, OD and length
7.Lead Working Condition
8.It’s Better to Provide Us With The Drawings/Pictures
After-sale Service Is Available Within One Year Warranty Period for Mica Plastic Extrude Heater band heater.
That means if any quality problems occur within one year , we provide technical guidance through internet
Q:Are you a trade company or a manufacturer?
A: We are manufacturer.
Q:What is your payment terms?
A: 30% TT deposit in advance and 70% balance before shipment.
Q:Sample time and delivery time ?
A:Normally it will take u about 7 days to finish the sample,and for mass production is based on quantity.
Q: What is your working time?
A:Our working time is from Monday to Saturday, 8:30 AM -17:00 PM (Beijing time, GMT+08.00).
Q: Do you provide free samples?
A:Yes, we do. but we do not bear the shipping costs.
Q: How about the lead time and payment terms?
A:The lead time usually takes 1 to 3 weeks if we have materials in stock, otherwise, it will take another 1-2 weeks. the delivery time also can be decided by the quantities
Concerning the payment terms, T/T,L/C, D/P,D/A,Western Union
More inquiry,please feel free to contact with me anytime!
Our friendly team would love to hear from you!